3-27
PC290-ENG
SERVICE ITEM
PAGE
Lubricating
•
Boom foot pin (2 points)
3-51
•
Boom cylinder rod end (2 points)
3-51
•
Arm cylinder foot pin (1 point)
3-51
•
Boom-arm coupling pin (1 point)
3-52
•
Arm cylinder rod end (1 point)
3-52
•
Bucket cylinder foot pin (1 point)
3-52
•
Arm-link coupling pin (1 point)
3-52
•
Arm-bucket coupling pin (1 point)
3-52
•
Link coupling pin (2 point)
3-52
•
Bucket cylinder rod end (1 point)
3-52
•
Bucket-link coupling pin (2 points)
3-52
Check oil level in swing machinery case, add oil
3-52
Drain water and sediment from fuel tank
3-53
Clean fresh air intake filter
3-53
EVERY 250 HOURS SERVICE
Check oil level in final drive case, add oil
3-55
Check level of battery electrolyte
3-56
Lubricate swing circle (3 points)
3-57
Check air conditioner compressor belt tension, adjust
3-58
EVERY 500 HOURS SERVICE
Replace fuel filter cartridges
3-59
Check swing pinion grease level, add grease
3-61
Change oil in engine oil pan, replace engine oil filter cartridge
3-62
Clean and inspect radiator fins, oil cooler fins and condensor fins
3-63
(only for machines equipped with air-conditioner)
Replace hydraulic tank breather element
3-64
Replace hydraulic filter element
3-64
23. MAINTENANCE SCHEDULE CHART
Summary of Contents for PC290LC-6K
Page 2: ......
Page 44: ...1 32 PC290 ENG MEMO ...
Page 45: ...2 1 PC290 ENG OPERATION ...
Page 146: ...2 102 PC290 ENG MEMO ...
Page 147: ...3 1 PC290 ENG MAINTENANCE ...
Page 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Page 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Page 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Page 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Page 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Page 264: ...5 30 PC29 ENG MEMO ...