5-25
PC29-ENG
30.4 GRAPPLE BUCKET
MAIN FIELDS OF APPLICATION
°
Demolition
°
Disposing of industrial waste
°
Forestry
This bucket is widely used for demolition including breaking-up work,
grading and digging, clean-up work after natural disasters, dumping in-
dustrial waste, and forestry work, etc.
MISTAKEN METHODS OF USE
To ensure that the machine has a long life, and to ensure that opera-
tions are carried out in safety, do not operate the machine in any of the
following ways.
Do not operate the cylinder to the end of its stroke. Always leave
approx. 5 cm (2 in) to spare.
Operations using the swing force
Grabbing a object using buckets on only one side
Closing the sub-bucket with the boom and arm fully extended.
Impact operation with no load
30. EXTENDING MACHINE SERVICE LIFE
Summary of Contents for PC290LC-6K
Page 2: ......
Page 44: ...1 32 PC290 ENG MEMO ...
Page 45: ...2 1 PC290 ENG OPERATION ...
Page 146: ...2 102 PC290 ENG MEMO ...
Page 147: ...3 1 PC290 ENG MAINTENANCE ...
Page 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Page 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Page 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Page 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Page 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Page 264: ...5 30 PC29 ENG MEMO ...