3-28
PC290-ENG
23. MAINTENANCE SCHEDULE CHART
SERVICE ITEM
PAGE
EVERY 1000 HOURS SERVICE
Change oil in swing machinery case
3-65
Check oil level in damper case, add oil
3-66
Check all tightening parts of turbocharger
3-66
Check play of turbocharger rotor
3-66
Check and adjust valve clearance (1
st
1000 hour only)
3-66
Check fan belt tensioner bearing, belt and fan hub
3-67
Check fan belt tension
3-67
EVERY 2000 HOURS SERVICE
Change oil in final drive case
3-68
Clean hydraulic tank strainer
3-69
Clean, check turbocharger
3-70
Check alternator, starting motor
3-70
Check vibration damper
3-70
Change antifreeze
3-70
Check and adjust valve clearance
3-70
EVERY 4000 HOURS SERVICE
Check water pump
3-71
EVERY 5000 HOURS SERVICE
Change oil in hydraulic tank
3-71
23.2 MAINTENANCE WHEN USING
HYDRAULIC BREAKER
For machines equipped with a hydraulic breaker, the hydraulic oil
deteriorates faster than for normal bucket digging operations, so set the
maintenance intervals as follows.
•
Replacing hydraulic filter element
On new machines, replace the element after the first 100 to 150 hours,
then carry out further replacement of the element according to the ta-
ble on the right.
•
Changing oil in hydraulic tank
Change the oil according to the table on the right.
Summary of Contents for PC290LC-6K
Page 2: ......
Page 44: ...1 32 PC290 ENG MEMO ...
Page 45: ...2 1 PC290 ENG OPERATION ...
Page 146: ...2 102 PC290 ENG MEMO ...
Page 147: ...3 1 PC290 ENG MAINTENANCE ...
Page 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Page 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Page 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Page 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Page 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Page 264: ...5 30 PC29 ENG MEMO ...