5-9
PC29-ENG
28.3. ATTACHMENT MOUNTING /
DISMOUNTING PROCEDURE
DISMOUNTING PROCEDURE
1.
Curl the arm in then lower the boom to the
ground.
Set the attachment valves on the arm to
the stop position as shown.
2.
Place the attachment on the ground and
stop the engine.
3.
Operate levers and attachment pedals to
full stroke 2 to 3 times to release hydraulic
system pressure. Ensure oil temperature
is low.
4.
Remove the hoses on the attachment side. Install the blind plugs to
the two outlets
a
.
Install blind plugs to the attachment hoses to prevent entry of dirt
during dismounting and storage.
5.
Dismount the attachment by removing the retaining pins (2 pins).
Then, mount the bucket.
For the bucket mounting procedure, see 12.15 “ R E P L A C E M E N T
AND INVERSION OF BUCKET’’.
6.
After the bucket is mounted, check the hydraulic oil level.
28. MACHINES READY FOR ATTACHMENTS
Summary of Contents for PC290LC-6K
Page 2: ......
Page 44: ...1 32 PC290 ENG MEMO ...
Page 45: ...2 1 PC290 ENG OPERATION ...
Page 146: ...2 102 PC290 ENG MEMO ...
Page 147: ...3 1 PC290 ENG MAINTENANCE ...
Page 171: ...3 25 PC290 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 223: ...4 1 PC290 ENG SPECIFICATIONS ...
Page 225: ...4 3 PC290 ENG 25 SPECIFICATIONS PC290LC 6K ...
Page 226: ...4 4 PC290 ENG 25 SPECIFICATIONS PC290NLC 6K ...
Page 230: ...4 8 PC290 ENG 25 SPECIFICATIONS Mono Boom ...
Page 233: ...5 1 PC29 ENG OPTIONS ATTACHMENTS ...
Page 264: ...5 30 PC29 ENG MEMO ...