MAINTENANCE
LOADING SHOVEL
7-16
(C): Injector installed on the boom
(D): Injector installed on the chassis
(19) Boom foot pin (RH)
(23) Arm cylinder head pin (RH)
(20) Boom foot pin (LH)
(24) Arm cylinder head pin (LH)
(21) Arm cylinder bottom pin (RH)
(F)
Grease fitting
(22) Arm cylinder bottom pin (LH)
(25) Boom cylinder bottom pin (RH)
(F)
Grease fitting
(26) Boom cylinder bottom pin (LH)
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...