MACHINE OPERATIONS AND CONTROLS
OPERATION
3-230
2.
Remove pin (1) from the arm mounting hole and pin (2)
from the link mounting hole, then remove the bucket.
q
With pin (1), remove grease piping cover (3) and
grease piping (4), then remove cover (5) and use the
removal tap in the side face of the pin to remove the
pin (both left and right).
q
With pin (2), remove stopper (6) on the inside of the
link, then use the removal tap on the outside face of
the pin to remove the pin (both left and right).
NOTICE
After removing the pins, make sure that mud or sand does
not get on them. Dust seals are fitted at both ends of the
bushings, be careful not to damage them.
3.
Align the arm with hole (A), align the link with hole (B), then
coat pins (1) and (2) with grease, and install them.
REMARK
Carry out the installation in the opposite order from removal.
When installing the bucket, the O-ring is easily damaged, so fit
the O-ring into the groove in bushing (a) at the bucket end (E).
After inserting the pin, move the O-ring to the specified groove
(b).
After fitting the stopper bolts, stoppers, collars, and covers to
each pin, carry out greasing of the pin.
(C): Arm (D): Seal (E): Bucket
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...