OPERATION
MACHINE OPERATIONS AND CONTROLS
3-175
4.
Loosen plug (2) and drain the water.
5.
Screw plug (2) in as soon as water has drained off and fuel
begins to flow out from drain hose (3).
q
Tightening torque: 0.2 - 0.45 Nm (0.02 - 0.046 kgm)
6.
Push down fuel shut-off lever (A) to open the fuel supply
circuit.
7.
After completing the water drain operation, bleed the air. Use the same procedure as when replacing the fuel
filter cartridge.
q
For details of the method of bleeding the air, see “BLEEDING AIR FROM FUEL CIRCUIT (4-45)“.
q
For details of the poor fuel arrangement specification machines (if equipped), see “Bleeding air from fuel
circuit with the electric priming pump (4-47)“.
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...