OPERATION
DETAILED CONTROLS AND GAUGES
3-137
Circuit Breaker(B)
The panel board is installed under the left floor step.
REMARK
This circuit breaker is a large-size breaker installed to circuits
where a large-capacity current is flowing. In the same way as
normal fuses and circuit breakers installed to the power board
inside the cab base room, this circuit breaker protects the elec-
trical components and wiring from burning out if there is a
surge of current.
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...