MAINTENANCE
MAINTENANCE PROCEDURE
4-53
4.
Remove plug (6) on the bottom of the check valve block (5)
and loosen air bleeding plug (7) on the side approximately
by 1 turn.
5.
Start the engine and run it at low idling for 2-3 minutes.
6.
Screw in drain valve (2) completely as soon as oil free of
white contamination begins to flow out of air bleeding plug
(3) and out of the plug (6) hole.
7.
Tighten air bleeding plugs (7) and (3). (Left and right, 2
places)
8.
Install plug (6).
9.
Finally tighten grease cylinder plug (1). (Left and right, 2
places)
Tightening torque
Air bleeding plug (3),(7),(1): 58.8 to 88.3 Nm (6 to 9 kgm)
Plug (6): 3.9 to 6.9 Nm (0.4 to 0.7 kgm)
REMARK
Always tighten plug (1) last.
Close all the drain valve and air bleed valves completely.
After bleeding the air, check and adjust the track tension. For details, see “CHECK AND ADJUST TRACK TEN-
SION (4-30)“.
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...