![Komatsu PC16R-3 Operation & Maintenance Manual Download Page 196](http://html1.mh-extra.com/html/komatsu/pc16r-3/pc16r-3_operation-and-maintenance-manual_1991224196.webp)
MAINTENANCE NOTES
194
4.2.1.4 KOWA
(KOMATSU OIL WEAR ANALYSIS)
This system requires that oil samples be periodically collected and analysed. This is a preventive maintenance
service, which makes it possible to identify faulty parts or worn machine components timely. It also allows many
failures to be prevented and machine downtime to be reduced.
Many years of experience and the availability of countless data and information allow Komatsu to accurately deter-
mine the conditions of the machine. This also allows us to locate troubles and suggest the most suitable and fast
repair solutions.
The customer immediately receives a report containing the results of the analysis and suggestions for the opera-
tions to be carried out. This low-cost service is very useful and allows customers to save money and avoid many
problems.
KOWA ANALYSIS STAGES
q
Analysis of metal particles
In this stage a ICP (Inductively Coupled Plasma) analyser is
used to measure the density of the metal particles present in the
oil.
q
Measurement of particle quantity
In this stage a PQI (Particle Quantifier Index) machine is used
to measure the quantity of large iron particles present in the oil.
q
Other analyses and measurements
In this stage other aspects, such as the percentage of water or
fuel in the oil and the dynamic viscosity, are analysed.
OIL SAMPLING
q
Collection interval
Every 500 hours: engine and other components
q
Precautions to be taken when sampling the oil
• Make sure that the oil is well mixed before sampling.
• Carry out sampling regularly, at fixed intervals.
• Do not carry out sampling on rainy or windy days, when water or dust can get into the oil.
For further details on KOWA, please contact your Komatsu Distributor.
WEAM012405
Summary of Contents for PC16R-3
Page 2: ......
Page 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Page 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 191: ...MAINTENANCE 189 WEAM012405...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Page 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Page 286: ...284 WEAM012405...
Page 287: ......
Page 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...