USE OF THE MACHINE AND RELATED CONTROLS
153
3.3.13 OPERATIONS THAT CAN BE PERFORMED WITH THE HYDRAULIC
EXCAVATOR
In addition to those indicated below, many other applications are possible, thanks to the use of various attach-
ments.
EXCAVATION
When the machine is in the position shown in the diagram on the
right, the maximum digging force and thrusting force of the single
cylinders is obtained when the bucket cylinder and the relevant
articulation, the arm cylinder and the arm are at 90° with respect
to each other.
During digging operations, keep this amplitude to increase the ef-
ficiency of the machine.
The positions available for digging with the arm range from a 45°
angle away from the machine to a 30° angle towards the ma-
chine.
There may be some differences depending on the digging depth,
but it is advisable to try to keep within the above range rather than
operate with the cylinders reaching the end of stroke.
SIDE DITCHING
Ditch digging operations can be performed effectively by installing
a bucket suitable for digging ditches and positioning the tracks
parallel to the line that delimits the edge of the ditch.
o dig wide ditches, excavate the sides first and successively the
central part.
LOADING THE MACHINE
In places where the rotation angle is reduced, the effectiveness of
the operation can be increased by positioning the truck so that the
operator can comfortably see it.
The loading operation is easier and the loading capacity greater if
the hydraulic excavator works from the back and not from the
sides of the truck.
RKA16280
RYA17720
RYA02550
RYA02560
WEAM012405
Summary of Contents for PC16R-3
Page 2: ......
Page 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Page 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 191: ...MAINTENANCE 189 WEAM012405...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Page 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Page 286: ...284 WEAM012405...
Page 287: ......
Page 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...