7. Install the Finished Wall
Thin Wall
Twist the dome of the plaster guard to separate it from the outer
ring. Discard the outer ring.
Slide the dome over the valve stem.
NOTE:
The plaster guard dome can be used as a guide for marking
the cutout.
Cut a 4
″
(102 mm) hole in the wall material.
For Valves with Stops:
Using the holes in the valve backing plate
as a guide, cut openings for the stops.
Secure the wall material to the valve backing plate at the
locations shown.
Leave the plaster guard dome in place at this time.
2-3/4" (70 mm)
Wall
Material
Discard.
45˚
1-9/16" (40 mm)
1-9/16"
(40 mm)
Ø 4-1/2"
(114 mm)
Drywall
Screws
Ø 4"
(102 mm)
Kohler Co.
13
1110626-2-H
Spec Seq#: 106
92633
Summary of Contents for K-3363
Page 1: ...Spec Seq 72 S 1...
Page 15: ...Spec Seq 81 S 2...
Page 31: ...Spec Seq 90 WF 1...
Page 49: ......
Page 50: ...Spec Seq 94 MB 1...
Page 52: ...5431 West 164th Street Brook Park Ohio 44142 Spec Seq 96 189085...
Page 53: ...Spec Seq 96 189085...
Page 54: ...Spec Seq 96 189085...
Page 55: ...5431 West 164th Street Brook Park Ohio 44142 Spec Seq 96 189085...
Page 58: ...Cartridge Maintenance Repair Guide Spec Seq 98 361769...
Page 76: ...Cartridge Maintenance Repair Guide Spec Seq 98 361769...
Page 94: ...Spec Seq 100 SH 1...
Page 174: ...Spec Seq 112 SH 2...