MF2933/BIR3
Installation
8
11/27/2012
Bradley •
215-1371 Rev. M; ECN 12-00-013
6
Electrical and Supply Connections
Connections of leads other than shown may cause permanent damage to the sensor.
Sensor cables must be attached before the battery cables are plugged into the
circuit boards.
A
Insert 3 different colored sprayhead
supply tubes into three solenoid tube
connectors by loosening tube connector
cap and firmly pushing tubing into tube
connector until the tubes are fully seated,
then re-tighten connector cap .
B
Connect the sensor cable from the right
hand station to the circuit board attached
to the solenoid with the black supply
tube .
C
Connect the sensor cable from the
center station to the circuit board
attached to the solenoid with the green
supply tube .
D
Connect the sensor cable from the left
hand station to the circuit board attached
to the solenoid with the red supply .
E
Insert the batteries into the battery
holders and then mount the battery
holders (with batteries) in a convenient
location in the pedestal .
F
Snap the battery connector cables into
the circuit board plugs .
Black Supply Tube
(from Sprayhead)
Green Supply Tube
(From Sprayhead)
Red Supply Tube
(From Sprayhead)
Solenoid
Connector
Compression
Nut
Solenoid Assembly
Navigator Mixing
Valve
Supply Inlet
Battery Cable
Sensor Cable
Battery Holder (S83-177)
6-Volt Battery
Type DL223A or Equivalent
(261-010)
Summary of Contents for K-3363
Page 1: ...Spec Seq 72 S 1...
Page 15: ...Spec Seq 81 S 2...
Page 31: ...Spec Seq 90 WF 1...
Page 49: ......
Page 50: ...Spec Seq 94 MB 1...
Page 52: ...5431 West 164th Street Brook Park Ohio 44142 Spec Seq 96 189085...
Page 53: ...Spec Seq 96 189085...
Page 54: ...Spec Seq 96 189085...
Page 55: ...5431 West 164th Street Brook Park Ohio 44142 Spec Seq 96 189085...
Page 58: ...Cartridge Maintenance Repair Guide Spec Seq 98 361769...
Page 76: ...Cartridge Maintenance Repair Guide Spec Seq 98 361769...
Page 94: ...Spec Seq 100 SH 1...
Page 174: ...Spec Seq 112 SH 2...