
40
Hardware
4 x
1/4 x 1-3/8” Wafer Lag
WL3
WL3
WL3
Hand Grip
1” (25mm)
9248
Other Parts
2 x Hand Grip
Pre-drill all holes using a 1/8” drill bit before installing the Wafer Lags
A:
On the front (9248) Narrow Panel, measure 1” (25mm )up from the top of the floor boards and center 1 Hand
Grip on each side . Pre-drill, then attach Hand Grips with 2 (WL3) 1/4 x 1- 3/8” Wafer Lags per Hand Grip .
Step 10: Attach Hand Grips to Tower
Fig. 10.2
Fig. 10.1