Keysight PD1000A Power Device Measurement System Startup Guide
61
Additional Test Information
IV and CV Device Characterization
IV and CV Test Output File Structure
The file structure for IV and CV tests is:
Notes:
–
The
Output Directory
is set in the
Settings > Global Settings
dialog for each
test.
–
The first level sub-folders (T27, T75. and T125 in the example above)
represent the temperatures the device was tested at for IV tests only. The
first subfolder is sometimes named “Tnom” for room temperature
measurements.
–
Multiple *.mdm files exist in each second level sub-folder. The actual file
names to be different depending on whether you are testing an IGBT or a
FET. The specific temperature and type of measurement are encoded in the
file names.
–
S-Parameter tests (both on-state and off-state) and most CV tests are
done at room temperature only. Hence, they exist only in the first “T”
sub-folder (T27 in this example).
Figure 30
IV and CV File Structure showing Sample IV .mdm Files
Summary of Contents for PD1000A
Page 1: ...Keysight PD1000A Power Device Measurement System for Advanced Modeling Startup Guide ...
Page 2: ......
Page 4: ......
Page 8: ...viii Keysight PD1000 Power Device Measurement System Startup Guide ...
Page 104: ...102 Keysight PD1000A Power Device Measurement System Startup Guide Glossary IGBT Terms ...
Page 107: ......