Keysight PD1000A Power Device Measurement System Startup Guide
37
IV and CV Test Requirements
IV and CV Device Characterization
Configure EasyEXPERT
1
Select
Tools > System > Configuration...
. This opens the EasyEXPERT
Configuration Editor screen.
2
Select the
Modules
tab.
3
Verify that the modules listed match the modules actually installed in your
power device analyzer and the status of every SMU is “
PASS
”.
Figure 12
Modules Tab of Configuration Editor for the B1506A Options H51 and
H71. (Option H21 is different.)
Write down or make a screen capture of the Configuration window
so that you can easily enter SMU name information for the
following steps (through “Enable Temperature Regulation Loop” on
page 45).
The following steps (through “Enable Temperature Regulation
Loop” on page 45) are required for B1506A Options H51 and H71
only. They are not required for Option H21.
Summary of Contents for PD1000A
Page 1: ...Keysight PD1000A Power Device Measurement System for Advanced Modeling Startup Guide ...
Page 2: ......
Page 4: ......
Page 8: ...viii Keysight PD1000 Power Device Measurement System Startup Guide ...
Page 104: ...102 Keysight PD1000A Power Device Measurement System Startup Guide Glossary IGBT Terms ...
Page 107: ......