Keysight PD1000A Power Device Measurement System Startup Guide
IV and CV Device Characterization
IV and CV Test Requirements
4
Select the
UHC Expander / Fixture
tab.
5
Ensure the following fields are checked or complete:
--
Enable Ultra Hight Current
checkbox is checked.
--
Voltage Control SMU:
field is complete.
--
Current Control SMU:
field is complete.
--
Enable Selector
checkbox is checked.
--
Enable Gate Control
checkbox is checked.
--
UHCU:
field is complete (confirm after clicking the Apply button).
--
HVSMU:
field is complete.
--
SMU:
field in both the Input and Gate Control boxes are complete.
--
Thermometer:
Channels 1 and 2 are checked
--
Auto Detection:
checkbox is checked.
6
Click the
Apply
button.
Figure 13 UHC Expander / Fixture
tab of Configuration Editor (for B1506A H71)
Copy or make a screenshot of the preceding information so that
you can use it later for
PD1000A Hardware Configuration
and to
configure PD1000A test settings.
Summary of Contents for PD1000A
Page 1: ...Keysight PD1000A Power Device Measurement System for Advanced Modeling Startup Guide ...
Page 2: ......
Page 4: ......
Page 8: ...viii Keysight PD1000 Power Device Measurement System Startup Guide ...
Page 104: ...102 Keysight PD1000A Power Device Measurement System Startup Guide Glossary IGBT Terms ...
Page 107: ......