1
Keysight ZA0060A Quick Start Guide
45
Test Steps and Description
Go-NoGo Test
Performs the PER test by sweeping through the specified values of output power and step size according
to the values set in Power List. Use this step to determine the power levels where the DUT fails or
passes.
Advanced Settings:
– Power List (dBm): Enter the values in this order; minimum output power : step size : maximum output
power. For example, when the step size is set as 5, the test step will cycle in 5 dBm increment from
-100 to -95 dBm, then to -90 dBm and so on up until the minimum or maximum output power set.
– End test when fail: Check this box to end the test plan when this test step reports a Fail.
The Early Fail Count, Delay between Step, Reconnect Retries, and Preferred Mode parameters are as
described under
test step.