1
Keysight ZA0060A Quick Start Guide
32
Test Steps and Description
Establish Zigbee Link
This test step must be a child step of
. This test step establishes network with
router or end device depending on the role of 34999B module as coordinator or router.
Step Settings
– Timeout: Set the time (seconds) to wait for the link to be established between 34999B and DUT.
– Execution Mode: Select either GUI or CLI mode. Choosing GUI will prompt a pop-up window to show
that the link is being established. You will not see any pop-up window using CLI mode.