7 Run Power Calibration
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
59
7 Run Power Calibration
Before running Power Calibration on mmWave ports, review the following:
1. Review
2. Review
Calibration Equipment Required
3. Review
Calibration Connectors (Ports 1 to 8)
How to proceed...
4.
Run S910xA System Calibration Software
5. Connect Equipment
See
6. Perform Alignments
See
Using X-Apps to Perform Alignments
7. Perform Calibration
See
Summary of Contents for S9100A
Page 1: ...Startup Guide S9100A 5G Multi Band Vector Transceiver...
Page 6: ...2 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 40: ...36 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 52: ...48 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 54: ...50 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 93: ...7 Run Power Calibration S9100A 5G Multi Band Vector Transceiver Startup Guide 89...
Page 94: ...90 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 105: ...S9100A 5G Multi Band Vector Transceiver Startup Guide 101...