4 Install Hardware
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
43
Connect the hardware as described in the following table.
Item
Qty
Connection To... From...
1, 2,
11
3
8121-3044 RF Cable, SMA (m) to SMA (m), 350 mm (13.8 in)
Connect LO Card LO Aux Out to LO Distribution Card LO In.
Connect LO Distribution Card LO Out 1 to Channel Card 1 LO In.
Connect LO Card LO Out to Channel Card 2 LO In (right-side).
3
1
8121-3199 BNC Cable, BNC (m) to BNC (m), 300 mm (11.8 in)
Connect S9100A 10 MHz Out to E7770A CIU 10 MHz In.
4
1
8121-1351, LAN Cable, Patch-5E RJ-45 (m) to RJ-45 (m)
24-AWG 8-Conductor PVC, 2133.6 mm (84 in), Blue or equivalent
Connect M9037A PXIe Embedded Controller LAN 2
to E7770A CIU LAN CONTROL (rear panel).
5
1
S9100-60003 RF Cable, SMA (m) to TNC (m), 1100 mm (43.3 in)
Connect E7770A CIU CHANNEL 2A, LO/CTRL/PWR (rear panel)
to S9100A labeled: "Ch 1A In" (front panel).
6
1
S9100-60005 Three-Cable Bundle (Color-Coded)
White, SMA (m) to Type-N (m), 4000 mm (157.5 in)
Connect M1740A IF In/Out to S9100A IF In.
Black, SMA (m) to Type-N (m), 4000 mm (157.5 in)
Connect M1740A IF In to S9100A IF Out.
Red
, SMA (m) to TNC (m), 4000 mm (157.5 in)
Connect M1740A LO/Pwr/Ctrl IF In
to S9100A LO/Pwr/Ctrl Out.
7, 8
2
S9100-60011 RF Cable,
SMA (m) to Type-N (m), 1100 mm (43.3 in)
Connect from E7770A CIU CHANNEL 1A, DUT IF OUT (rear panel)
to S9100A labeled: "From Ch 1A DUT IF Out" (front panel).
Connect from E7770A CIU CHANNEL 1B, DUT IF IN (rear panel)
to S9100A labeled: "To Ch 1B DUT IF In" (front panel).
9, 10
2
S9100-60012 RF Cable,
Type-N (m) to Type-N (m), 457 mm (18 in)
Connect Channel Card IF Out B to CIU DUT IF Interconnection, IF In.
Connect Channel Card IF In A to CIU DUT IF Interconnection, IF Out.
1
8121-3222 loop-back cable, 2.4 mm (m) to 2.4 mm (m), 152.4 mm (6.0 in)
Connect this loop-back cable from RF Tx/Rx 1 to RF Tx/Rx 2
on the M1740A mmWave Transceiver.
Summary of Contents for S9100A
Page 1: ...Startup Guide S9100A 5G Multi Band Vector Transceiver...
Page 6: ...2 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 40: ...36 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 52: ...48 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 54: ...50 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 93: ...7 Run Power Calibration S9100A 5G Multi Band Vector Transceiver Startup Guide 89...
Page 94: ...90 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 105: ...S9100A 5G Multi Band Vector Transceiver Startup Guide 101...