6 Verify Operation
6. Set the RF Output to 3 GHz; this is the RF Out port on the Rugged Front Panel.
a. Select the drop-down menu panel (top-right corner)
select Input/Output, select the RF Source tab,
select the RF Output Port drop-down menu, and select RF Output.
b. Set RF Power to –10 dBm, Frequency to 3 GHz, and RF Output to On.
54
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
Summary of Contents for S9100A
Page 1: ...Startup Guide S9100A 5G Multi Band Vector Transceiver...
Page 6: ...2 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 40: ...36 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 52: ...48 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 54: ...50 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 93: ...7 Run Power Calibration S9100A 5G Multi Band Vector Transceiver Startup Guide 89...
Page 94: ...90 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Page 105: ...S9100A 5G Multi Band Vector Transceiver Startup Guide 101...