Carrying out emptying
45 / 61
2019/11
010-917_SON_EN
Carrying out emptying
You will find the individual program steps with recommendations for operating time in the table below. Basis for
calculation: Disposal times in accordance with Euro standard 1825 with water supply flow solenoid valve 1l/s for
DN25 or 3.6 m³/h.
Program section
Function
NS 2
NS 4
NS 7
NS 10 NS 15
Pump
Hand lever
Information about water supply
General information
1
Part empty
4 s
6 s
8 s
14 s
25 s
on
Empty
off
Lower water level by 10 cm
2
Mix
70 s
130 s
215 s
305 s
585 s
on
Flush
off
3
Empty
30 s
50 s
86 s
143 s
262 s
on
Empty
off
Until the pump runs empty
4
Fill
124 s
210 s
289 s
483 s
883 s
off
Flush
Hot water
valve on
approx. 25 cm filling height
5
Mix
35 s
65 s
110 s
150 s
290 s
on
Flush
off
6
Empty
9 s
15 s
21 s
35 s
64 s
on
Empty
off
Until the pump runs empty
7
Fill
124 s
210 s
289 s
483 s
883 s
off
Flush
Hot water
valve on
approx. 25 cm filling height
8
Flush
25 s
45 s
75 s
100 s
195 s
on
Flush
off
9
Empty
9 s
15 s
21 s
35 s
64 s
on
Empty
off
Until the pump runs empty
10
Fill
124 s
210 s
289 s
483 s
883 s
off
Flush
Hot water
valve on
approx. 25 cm filling height
11
Flush
15 s
25 s
40 s
50 s
100 s
on
Flush
off
12
Empty
9 s
15 s
21 s
35 s
64 s
on
Empty
off
Until the pump runs empty
13
Fill
462 s
782 s 1308 s 2182 s 3990 s
off
Empty
Cold water
valve on
Up to lower edge outlet
assembly