20 / 61
Installation
2019/11
010-917_SON_EN
3.2.3
Mounting the refill inlet
C D E F
The refill inlet is fitted to the grease separator ready for operation.
Grease the seal <45> during conversion.
•
Use the screw <42> to fit the attachment clamp <34> to the seat <A>
on the system tank.
• Insert the all-round seal <45> into the drill hole <B>.
•
Fit the refill inlet <17> into the passage seal <45> and screw tight
using the fastening clamp <34>.
3.2.4 Installing the screw-type valve - E
C D
E
F
The valve must be fitted horizontally.
• Install the screw-type valve(s) <50> in the water supply pipe(s).
3.2.5 Installing the solenoid valves - F
C D E
F
The valve must be fitted horizontally.
• Install the solenoid valves <51> as shown and connect them
accordingly
to the water pipes (cold / hot
1
).
• Install the screw-type valves and connect them accordingly to the
water pipes (cold / hot
2
).
The electrical connection is described with installation of the control
unit.
1) Hot water is recommended
2) Hot water is recommended
B
34 42
17
A
45
Abb. [17]
50
Abb. [18]
51
Abb. [19]