BOP 5-20DL 081915
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION.
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR.
2.13
. If any indication of damage
is found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS, CONTROLS AND INDICATORS
a)
Front Panel: Refer to Figure 2-1. See Table 2-1 for an explanation of terminations,
controls and indicators.
b)
Rear Panel: Refer to Figure 2-2 and Table 2-2 for an explanation of terminations.
FIGURE 2-1. BOP 5-20DL, TERMINATIONS AND CONTROLS, FRONT PANEL
TABLE 2-1. BOP FRONT PANEL TERMINATIONS AND CONTROLS
FIG.
INDEX NO.
NAME OF TERMINATION
OR CONTROL
FUNCTION
FRONT
1
A-C POWER circuit breaker
A-C circuit breaker/power switch.
2
VOLTAGE CONTROL
switch
ON-OFF switch is set to ON to allow VOLTAGE control (3) to provide manual
adjustment of the BOP d-c output voltage
3
VOLTAGE control
Provides manual adjustment of BOP d-c output voltage when VOLTAGE
CONTROL switch set to ON.
4
VOLTAGE meter
Eo d-c digital output voltmeter
5
REMOTE OUTPUT ON-OFF
indicator
LED Lights to indicate BOP output is enabled (ON) by remote signal applied to
REMOTE ON-OFF port at rear panel.
6
MODE switch
Operating mode switch to select either Voltage or Current mode.
See
Table 2-1
for function.
Summary of Contents for BOP 5-20DL
Page 2: ......
Page 7: ......
Page 8: ......
Page 22: ......
Page 24: ......
Page 31: ......
Page 33: ...FIGURE 2 5 LOAD CONNECTION USING LOCAL SENSING AT REAR PANEL...
Page 34: ......
Page 47: ...instead of the front panel Voltage Programming Input terminals inverting...
Page 64: ......
Page 66: ......
Page 70: ......