4-2
BOP 5-20DL 081915
FIGURE 4-1. LOCATION OF INTERNAL CALIBRATION CONTROLS
4.2.1
ADJUSTMENT OF (±) 10 VOLT CALIBRATION CONTROLS (A1R31, A1R32)
1. Turn BOP off and remove the cover (see Figure 4-2).
2. Connect a precision digital voltmeter to the Rear Programming Connector terminal 28 (+10V)
referenced to Common (terminal 23, 25, 27, 29, 31 or 33) for +10V adjustment.
3. Turn the BOP on and locate the +10V CAL control, A1R31 (see Figure 4-2).
4. Adjust control to +10V ±0.1mV as read on the digital voltmeter.
5. Connect a precision digital voltmeter (DVM) to terminal 22 (–10V) of the Rear Programming
Connector referenced to Common (terminal 23, 25, 27, 29, 31 or 33) for –10V adjustment.
6. Adjust –10V CAL control, A1R32 (see Figure 4-2) to –10V ±0.1mV as read on DVM.
Summary of Contents for BOP 5-20DL
Page 2: ......
Page 7: ......
Page 8: ......
Page 22: ......
Page 24: ......
Page 31: ......
Page 33: ...FIGURE 2 5 LOAD CONNECTION USING LOCAL SENSING AT REAR PANEL...
Page 34: ......
Page 47: ...instead of the front panel Voltage Programming Input terminals inverting...
Page 64: ......
Page 66: ......
Page 70: ......