BOP HIPWR 080709
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR. 2.3. If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a) Front Panel: Refer to Figure 3-1 and Table 3-1.
b) Rear Panel: Refer to Figure 2-1 and Table 2-1.
FIGURE 2-1. BOP SERIES REAR PANEL
Summary of Contents for BOP 1000W
Page 2: ......
Page 10: ......
Page 20: ......
Page 31: ......
Page 32: ......
Page 36: ......
Page 50: ...FIGURE 2 2 LOAD CONNECTIONS LOCAL SENSING...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 64: ......
Page 68: ...FIGURE 3 3 POWER UP SCREEN SHOWING GRAPHIC METERS VOLTAGE 0000 0...
Page 125: ......
Page 128: ......