Operation
17
Operation
Transport and installation
Damage to the centrifuge by jolting!
Transport the centrifuge only in the
upright position using the special box
provided with the instrument and
secure it properly. Place the centri-
fuge carefully.
Make sure the rotor transport protection
has been removed before starting the
instrument!
The
Biofuge haemo
is now ready for use.
Mains connection
Make sure that your mains voltage and frequency
match the specifications on the instrument before con-
necting the centrifuge to the mains supply.
The instrument does not have a mains switch.
After you have established the mains connection, the
following reading appears in the control panel:
This tells you that the
instrument carries out an
internal check of its soft-
ware.
If the lid is closed, the display in the panels "speed" and
"time" changes to "0" after a couple of seconds:
With opened lid, the
"speed" panel displays
the message "OPEN"
instead.
If you do not intervene, the display changes to the
standby mode after 2 minutes. The displays turn dark;
however, the centrifuge is ready for use at any time.
This is signaled by the flashing red light in the "time"
panel.
Biofug
e
haemo
set
set
speed
time
lid
quick
run
start
stop
+
-
INSTRUMENTS
8.8.8.8.8.
8.8.
Biofug
e
haemo
set
set
0
0
speed
time
Summary of Contents for Heraeus Biofuge haemo
Page 1: ...Instructions for use Biofuge haemo ...
Page 3: ...Biofuge haemo set set 1 2 0 0 0 1 0 speed time lid quick run start stop INSTRUMENTS ...
Page 10: ...For your safety 6 for your notes ...
Page 18: ...Accessories 14 for your notes ...
Page 20: ...Before use 16 for your notes ...
Page 41: ...Operation 37 for your notes ...
Page 51: ...Troubleshooting 47 ...