Maintenance Recommendations
Important:
Only qualified service technicians should perform maintenance recom-
mendations.
The KT-1 includes a lithium CR2032 primary battery. To avoid risk of explosion, the
battery must be replaced by a qualified service technician only. Do not crush, punc-
ture, open, disassemble or otherwise mechanically interfere with the battery. Do
not try to recharge the battery. If you need to dispose of the PCB and/or the lithium
battery, wrap the KT-1 in non-conductive tape. Check with your local authorities for
battery disposal regulations.
Warning:
Do not store the batteries in such a way that they come into contact with
each other or with any piece of metal. Explosion or fire may occur. Should fire
occur, use only dry chemical fire extinguishers. Do not use water to put out the fire.
Do not heat the batteries. Do not dispose of the batteries or PCB in a fire. Do not dis-
assemble the batteries. Do not apply pressure to deform the batteries. Ensure that
the above precautions are strictly observed by related departments, including, but
not limited to, production, sales and outside contractors.
CAUTION:
Risk of Fire, Explosion, And Burns. Do Not Recharge, Disassemble, Heat
Above 100°C Or Incinerate.
Configuring the KT-1 with the Web Configuration Page
This procedure is useful for configuring the KT-1 prior to going on site.
1 -
Determine your connection to the KT-1 and choose the appropriate network
cable that you need.
2 -
Make sure the KT-1 is in Forced Default Static mode before starting the con-
figuration. Verify the heartbeat patterns to determine the status. See the
Power LED Status Indicator table for details.
3 -
Start your web browser and enter the following IP: 192.168.1.2 and press
Enter
.
Note:
The Web Configuration is for initial system set up only, and will no longer be
accessible once the system is configured.
© Copyright, 2016, all rights reserved
42
Summary of Contents for KT-1
Page 1: ......
Page 6: ...6 Copyright 2016 all rights reserved ...
Page 10: ...10 Copyright 2016 all rights reserved ...
Page 17: ...Wiring Charts KT 1 Inputs and Outputs View Copyright 2016 allrights reserved 17 ...
Page 18: ...KT 1 PCB Inputs and Outputs View Copyright 2016 all rights reserved 18 ...
Page 19: ...KT 1 EU Inputs and Outputs View Copyright 2016 allrights reserved 19 ...
Page 20: ...KT 1 PCB EU Inputs and Outputs View Copyright 2016 all rights reserved 20 ...
Page 32: ...Inputs for KT 1 Inputs for KT 1 PCB Copyright 2016 all rights reserved 32 ...
Page 50: ......