Table 18: Site Preparation Checklist (continued)
Date
Performed By
For More Information
Item or Task
“Rack Requirements” on page 55
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the external Routing Engine.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
XRE200 External Routing Engines
XRE200 External Routing Engine
Engines and EX8200 Switches” on
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings | 133
Installing and Connecting an XRE200 External Routing Engine | 70
48
Summary of Contents for XRE200 -
Page 1: ...XRE200 External Routing Engine Hardware Guide Published 2020 12 15...
Page 135: ...135...
Page 142: ...142...
Page 155: ...Jewelry Removal Warning 155...
Page 158: ...Operating Temperature Warning 158...
Page 168: ...DC Power Disconnection Warning 168...
Page 172: ...DC Power Wiring Sequence Warning 172...