6. Verify the components received against the packing list included with the external Routing Engine. An
inventory of parts provided with the external Routing Engine is provided in
.
7. Save the shipping carton and packing materials in case you need to move or ship the external Routing
Engine later.
Figure 19: Unpacking an XRE200 External Routing Engine
Table 29: Inventory of Components Provided with an XRE200 External Routing Engine
Quantity
Component
1
XRE200 External Routing Engine
2
Fan module (preinstalled)
2
AC or DC power supply (preinstalled)
1
Virtual Chassis Control Interface (VCCI) module (preinstalled)
2
Hard disk drive (HDD) module (preinstalled)
1
Blank module (preinstalled)
69
Summary of Contents for XRE200 -
Page 1: ...XRE200 External Routing Engine Hardware Guide Published 2020 12 15...
Page 135: ...135...
Page 142: ...142...
Page 155: ...Jewelry Removal Warning 155...
Page 158: ...Operating Temperature Warning 158...
Page 168: ...DC Power Disconnection Warning 168...
Page 172: ...DC Power Wiring Sequence Warning 172...