for instructions on removing AC power supplies. If there are only three standard-capacity
AC power supplies installed in the services gateway, proceed to the next step.
5. Install a high-capacity AC power supply in the vacant slot in the back of the chassis. See
SRX5600 Services Gateway AC Power Supply” on page 256
for instructions on installing AC power
supplies.
6. Check the LEDs on the high-capacity AC power supply faceplate to ensure that it is operating properly.
7. Remove the standard-capacity AC power supply from any other PEM slot in the chassis. See
an SRX5600 Services Gateway AC Power Supply” on page 255
for instructions on removing AC power
supplies.
8. Install a high-capacity AC power supply in the slot you vacated in Step
. See
Services Gateway AC Power Supply” on page 256
for instructions on installing AC power supplies.
9. Check the LEDs on both high-capacity AC power supply faceplates to ensure that they are operating
properly.
10. Remove the remaining two standard-capacity AC power supply from the services gateway. See
“Removing an SRX5600 Services Gateway AC Power Supply” on page 255
for instructions on removing
AC power supplies.
11. If you are upgrading to four high-capacity AC power supplies to achieve 2+2 redundancy, install
high-capacity AC power supplies in the slots you vacated in Step
. See
“Installing an SRX5600 Services
Gateway AC Power Supply” on page 256
for instructions on installing AC power supplies.
12. Check the LEDs on all installed high-capacity AC power supply faceplates to ensure that they are
operating properly.
To upgrade a services gateway that has two standard-capacity DC power supplies to two or four
high-capacity DC power supplies:
1. Ensure that the services gateway is running Junos OS Release 12.1X44-D10 or later. Earlier Junos OS
releases do not recognize high-capacity DC power supplies.
2. If you have not already done so, replace the standard-capacity fan tray with a high-capacity fan tray.
For more information, see
“Replacing the SRX5600 Services Gateway Fan Tray” on page 248
3. Install high-capacity DC power supplies in the two empty PEM slots in the back of the chassis. See
“Installing an SRX5600 Services Gateway AC Power Supply” on page 256
for instructions on installing
DC power supplies.
267
Summary of Contents for SRX5600
Page 1: ...SRX5600 Services Gateway Hardware Guide Published 2020 02 14 ...
Page 23: ......
Page 105: ...LEDs 106 ...
Page 114: ...Figure 51 SRX5K MPC g030309 MPC empty 115 ...
Page 124: ...Port and Interface Numbering 125 ...
Page 130: ...Port and Interface Numbering 131 ...
Page 156: ......
Page 185: ......
Page 193: ...Figure 84 Installing the Front Mounting Hardware for a Four Post Rack or Cabinet 196 ...
Page 239: ......
Page 285: ...c Upload the configuration to RE2 from the USB device 288 ...
Page 372: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5600 377 ...
Page 373: ......
Page 407: ......
Page 420: ...423 ...
Page 423: ...Restricted Access Area Warning 426 ...
Page 430: ...433 ...
Page 443: ...Jewelry Removal Warning 446 ...
Page 446: ...Operating Temperature Warning 449 ...
Page 456: ...DC Power Disconnection Warning 459 ...
Page 460: ...DC Power Wiring Sequence Warning 463 ...
Page 463: ...DC Power Wiring Terminations Warning 466 ...
Page 466: ...DC Power Disconnection Warning 469 ...
Page 470: ...DC Power Wiring Sequence Warning 473 ...