2-wire satellite unit
You switch and dim your lighting with the 2-wire satellite unit.
In total, the satellite unit has exactly as many functions as
those of the attachment placed on the master unit.
The operation is performed in combination with the Standard
centre plate.
The 2-wire satellite unit is mounted in device sockets according
to DIN 49073.
Overview of the functions:
− Can only be combined with the Standard centre plate
− Low-cost control point
− Installation of other control points for the control of LB Management Light
− Any number of 2-wire satellite units can be connected to a master unit
− Maximum total cable length 100 metres
− 230 V AC, 50/60 Hz
− Screw terminals
3-wire satellite unit
The 3-wire satellite unit provides you with many different
functions independently of the insert and attachment at the
master unit.
In total, the satellite unit has exactly as many functions as
those of the attachment placed on the master unit.
The operation is performed using LB Management attach-
ments.
The 3-wire satellite unit is mounted in device sockets according
to DIN 49073.
Overview of the functions:
− Can be combined with all attachments
− Different applications are possible due to various possible combinations of the LB Manage-
ment attachments and inserts
− Extension of the detection area of automatic switches
− Installation of other control points for the control of LB Management Light
− Switching on with the last set brightness or with the saved switch-on brightness
− A maximum of ten 3-wire satellite units can be connected to one or more master units
− Maximum total cable length 100 metres
− 230 V AC, 50/60 Hz
− Screw terminals
66
LB MANAGEMENT LIGHT
Summary of Contents for LB management
Page 1: ...21 LB Management...
Page 2: ...Company founder Albrecht Jung Ernst Paris 2 COMPANY...
Page 4: ...4 PREFACE...
Page 9: ...THE JUNG LB MANAGEMENT 9...
Page 11: ...THE JUNG LB MANAGEMENT 11...
Page 15: ...THE JUNG LB MANAGEMENT 15...
Page 17: ...THE JUNG LB MANAGEMENT 17...
Page 31: ...Casa Fonte Boa Portugal Photos Jose Campos USAGE SCENARIOS 31 USAGE SCENARIOS 31...
Page 33: ...01 04 04 04 01 02 03 USAGE SCENARIOS 33...
Page 43: ...EQUIPMENT OVERVIEW 43...
Page 51: ...LB MANAGEMENT LIGHT 51...
Page 111: ...LB MANAGEMENT SHADING 111...
Page 139: ...TEMPERATURE CONTROL 139...
Page 155: ...THE CLEVER CONFIG APP 155...
Page 173: ...OPERATION 173...