Page 19
MOVING the TRAMPOLINE
If you need to periodically move your trampoline all slip joints should be secured with a weather resistant tape (i.e. duct
tape). This will keep the frame intact and prevent the tubular elements from separating during the move. The trampoline
should be moved by at least two people, kept horizontal, and lifted slightly on the side opposite the wheels. Then pull on
the trampoline - using the wheels to help move the leg still on the ground. Disassemble the trampoline for any other type
movement.
BETTER YET!!
Consider purchasing the Jumpking trampoline tie down kit - an optional accessory - this will hold the frame
together - plus the secure the trampoline to the ground - part number JKTRTDWM (see pages 31 and 35)
Now: Push down on all the sockets to make sure the legs are fully inserted and check all other slip joints to make
sure they are fully inserted.
Step 5:
We are now going to install the wheels using the same proce-
dure we used on the prior three (3) leg supports.
Refer to Figure 4.
Slide the long end of a short vertical leg piece into the remain-
ing top rail right socket.
Slide two (2) wheels onto the bottom curved horizontal piece.
Slide the straight center piece into the bottom curved horizontal
piece.
Install the two (2) remaining wheels on the left short vertical
piece and slide it over the bottom straight piece.
NOW PLACE YOUR RIGHT FOOT ON THE BOTTOM OF
THE LEG - OVER THE TWO WHEELS - TO HOLD IT DOWN
AND THEN USE BOTH HANDS TO PULL THE LEG OVER
INTO THE SOCKET.
Pull leg into socket
Right
foot
Straight piece
Step 6:
FIGURE 4
Wheels
Short vertical
leg piece