Page 18
Step 3:
18
Step 4:
Before completing Step's 3 - 4, take a moment to review
Figure 3. A series of drawings portrays the assembly
sequence and flows from the top to the bottom of the
figure. Two people are required for the leg support as-
sembly.
The top rail assembly has eight (8) leg sockets. These sockets
are now on the ground. Place a long vertical leg piece into
every OTHER of the first 6 sockets. One end of the leg slides
into the socket. This will raise the top rail assembly and it is
now supported at 3 points (See Fig. 3). One person should
hold up the rail at the vacant socket where no leg has been
installed. This is where a short vertical leg piece will be placed
when the wheels are installed.
The trampoline has four (4) leg support assemblies. Three
of these do not have wheels. First assemble the three leg
supports without wheels.
Two people are required for this assembly
At each vertical leg piece (call this the "right" leg)
perform the following steps:
Rotate the vertical leg away from the top rail and install the
center leg piece - "V" TIP IS UP.
Then add the "left" vertical leg piece to
the center leg piece.
Then rotate the assembly and place the "left" leg into
the adjacent socket on the top rail.
NOTE: The legs are designed to be slightly narrower than the
sockets. This is for rigidity and a tight fit. To help "spring" the
left leg into its respective socket ...........
PLACE YOUR RIGHT FOOT ON THE BOTTOM OF THE LEG
TO HOLD IT DOWN AND THEN USE BOTH HANDS TO
PULL THE LEG OVER INTO THE SOCKET.
FIGURE 3
Top Rail with leg
socket
Top rail
Center
leg piece
Vertical
leg piece
Left
Right
Leg into socket
Top rail assembly on ground
Vertical leg into every
other socket
Rotate
Add center
leg piece
Pull leg into
socket
Add "left" vertical leg
piece
Called
"right"
Perform same
assembly steps at
next leg point
Completed leg support assembly
Left
Right
"V" TIP IS UP
Right
foot