
6 Assembly
28
6.7
Terminal box / operating unit
Installation site
✱
Make sure that the site is readily accessible, for calibration at a later time.
✱
The fixing must be secure and free from vibration.
✱
Avoid direct sunlight.
Drilling
template
A drilling template is included in these operating instructions (last page), to
mark out for wall mounting
without fixing brackets
.
Wall brackets
(included in delivery)
✱
Screw the four fixing brackets onto the terminal box /operating unit.
The fixing brackets can be rotated in 90° steps.
✱
Mount the terminal box / operating unit to a wall or plate by the fixing
brackets (using screws, dowels or similar).
Weather
protection
canopy
(option)
Wall mounting:
The weather protection canopy is mounted between the terminal box /
operating unit and the wall.
Pipe mounting:
The weather protection canopy is mounted between the terminal box /
operating unit and the pipe mounting assembly.
134
149
140
120
56
161
77
94
23
94
65
50
20
19
SERVICE
CAL
EXIT
PGM
Summary of Contents for 202610.0
Page 2: ......
Page 21: ...21 6 Assembly...
Page 23: ...23 6 Assembly...
Page 66: ......
Page 68: ......