Operating instructions
Commissioning
45
In the process cabinet, turn the
potentiometer (2) on the Salisol and Calzid-
Ex dosing pump (1) to maximum (right end
stop).
On the underside of the dosing pump (1),
set the F/T toggle switch (4) to T (manual),
set toggle switch in the direction of the rear
wall.
Place a beaker under the vent outlet (3) of
the dosing pump (1).
Venting the Salisol piping system
On the PLC, press the
and
buttons
at the same time.
The dosing pump starts pumping Salisol.
Slowly open the vent screw (2) on the
dosing pump (1) by 2 or 3 turns.
Wait until there is no more air coming out
of the vent outlet (3) of the dosing pump.
If the dosing pump stops, repeat the
procedure on the PLC until Salisol comes
out of the vent outlet (3) of the dosing
pump.
Slowly close the vent screw (2) on the
dosing pump.