Operating instructions
Installation
25
8.2.2
Wiring diagram
Certified rubber coupler (EU standard)
8.2.3
Installing the flow meter with impulse transmitter
The flow meter must be installed upstream of the dosing unit on the same pipe, since this
unit
regulates
the
proportional
dosing
of
the
disinfectant
solution.
See the " Installation
Install the flow meter (DN 32/40/50) with
impulse transmitter (1 impulse / L)
upstream of the dosing unit. See
installation instructions of the flow meter.
Install the flow meter (DN 65/80/100/125)
with impulse transmitter (1 impulse / L)
upstream of the dosing unit. See
installation instructions of the flow meter.
Summary of Contents for 9800.002
Page 6: ...Operating instructions Intended Use...
Page 7: ......