Date
Time
Runing hours
Motor
Evaporator
Condenser
Screw Chiller/Heat-pump Unit Record Table chiller situation:
100
~
215 TON model:
Compressor
Ambient
Tempearature
Yearly (or perform a more frequent inspection
according to the requirement)
1. Clearly drain out and replace the oil in oil separator
tank.
2. Evaporator and condenser
a. Inspect and clean the water drainage valve
b. Inspect and clean the pipes according to the requirements.
3. Inspect and maintain the electrical parts according to the
requirements.
4. Perform the chemical analysis to the system.
Dry-bulb/ Wet -bul
Evaporator pressure kPa
Discharge pressure kPa
Oil level (Seperator/compressor)
Current(A)
Entering Liquid temperature
℃
Leaving Liquid temperature
℃
Flow rate L/S
Liqudi level in sight galss
Entering Liquid temperature
℃
Leaving Liquid temperature
℃
Flow rate L/S
YEWS-E Water Cooling Screw Chiller/Heat Pump
Oil pressure kPa
55
Summary of Contents for YEWS Series
Page 79: ...YEWS electrical drawing compressor for 50Hz power 74...
Page 80: ...YEWS electrical drawing main board YEWS100H 130H 170H 200H 210H for 50Hz power 75...
Page 81: ...YEWSelectrical drawing main board YEWS215P for 50Hz power 76...
Page 82: ...77 YEWS electrical drawing Main Board YEWS100P 130P 170P 200P for 50Hz power...
Page 83: ...YEWS electrical drawing compressor for 60Hz power 78...
Page 84: ...YEWS electrical drawing main board YEWS100H 130H 170H 200H for 60Hz power 79...
Page 85: ...YEWS electrical drawing main board YEWS215P for 60Hz power 80...
Page 86: ...YEWS field connection for 60Hz power 81...
Page 87: ...Transformer for230V 3P 60Hz Application 82...
Page 88: ...Form No AP1105 IOM01 1216 EN Supersedes AP1105 IOM01 0316 EN...