3 TRANSPRORTATION, HANDLING AND STORAGE
3.1 DELIVERY AND STORAGE
To ensure consistent quality and maximum reliability, all
units are tested and inspected before leaving the factory.
The chiller may be ordered and shipped in any of the
following forms:
Form 1 (shipped complete)
Form 2 (shipped without refrigerant charge)
Units are containing nitrogen or refrigerant and YORK
“
L
”
oil
(
YORK
“
W
”
oil in HP units
)
under
pressure. Units are shipped without export crating unless
crating has been specified on the Sales Order.
If the unit is to be put into storage, prior to installation, the
following precautions should be observed:
Ensure that the unit is not exposed to rain.
Ensure that all openings, such as water connections, are
securely capped.
The unit should be stored in a location where there is
minimal activity to limit the risk of accidental physical
damage.
To prevent inadvertent operation of the pressure relief
devices the unit must NOT be hot water or steam cleaned.
It is recommended to let the functionary on the storage
site keep the key of the control board.
It is recommended that the unit be periodically inspected
during storage.
If the unit is stored longer than six months, the relative
requirements for Long-Term Storage (50.20-NM9 /50.20-
CL9 / 50.20-NM1) must be followed.
3.2 INSPECTION
The unit shipment should be checked on arrival to see that
all major pieces, boxes and crates are received. Each unit
should be checked on the trailer or rail car when received,
before unloading, for any visible signs of damage. Any
damage of signs of possible damage must be reported to the
transportation company immediately for their inspection.
When received at the job site,all containers should be
opened and the contents checked against the packing list.
Any material shortage should be reported to YORK
immediately.
3.3 RIGGING
Each unit has four lifting holes(two on each end) in the end
sheets which should be used to lift the unit. Care should be
taken at all times during rigging and handling to avoid
damage to the unit and its external connections. Lift only
using holes shown in Figure 3-1.
If optional shipping skids are used, remove them before
lowering the unit to its mounting position. Rig the uni to its
final location on the floor or mounting pad by lifting the
unit (or shell assembly) with an overhead lift and lower the
unit to its mounting position.
Don't move the unit on rollers, nor lift it by forklift.
CAUTION
YEWS-E Water Cooling Screw Chiller/Heat Pump
10
Summary of Contents for YEWS Series
Page 79: ...YEWS electrical drawing compressor for 50Hz power 74...
Page 80: ...YEWS electrical drawing main board YEWS100H 130H 170H 200H 210H for 50Hz power 75...
Page 81: ...YEWSelectrical drawing main board YEWS215P for 50Hz power 76...
Page 82: ...77 YEWS electrical drawing Main Board YEWS100P 130P 170P 200P for 50Hz power...
Page 83: ...YEWS electrical drawing compressor for 60Hz power 78...
Page 84: ...YEWS electrical drawing main board YEWS100H 130H 170H 200H for 60Hz power 79...
Page 85: ...YEWS electrical drawing main board YEWS215P for 60Hz power 80...
Page 86: ...YEWS field connection for 60Hz power 81...
Page 87: ...Transformer for230V 3P 60Hz Application 82...
Page 88: ...Form No AP1105 IOM01 1216 EN Supersedes AP1105 IOM01 0316 EN...