SECTION 4 - BOOM & PLATFORM
3121200
4-5
4.4
MAIN BOOM ASSEMBLY
Removal
NOTE:
Prior to removing the boom, it will be helpful to extend the
boom fly section out far enough to access the telescope cyl-
inder retaining pin if the boom is to be disassembled.
1.
Using an adequate lifting device, support the weight of
the main boom.
NOTE:
The main boom weighs approximately 1455 lbs. (660 kg).
2.
To gain access to the tele cylinder, remove the master
cylinder. Refer Section 4.6, Master Cylinder.
3.
Tag and disconnect the hydraulic hoses at the rear of the
telescope cylinder.
4.
Place blocking under the lift cylinder to prevent it from
dropping. Remove the bolt, keeper pin, and pivot pin
securing the rod end of the lift cylinder to the boom.
5.
Remove the bolt, nut, and pivot pin securing the top of
the timing link to the boom.
6.
Remove the bolt, keeper pin, and pivot pin securing the
boom to the turntable. Lift the boom away from the
machine and place it on proper supports for servicing.
MAE29050
Summary of Contents for T500J
Page 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Page 2: ......
Page 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Page 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Page 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Page 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Page 305: ......