SECTION 4 - BOOM & PLATFORM
4-24
3121200
3.
Install new 8-32 x 0.500 self threading screw on other
side. Torque to 18-20 in-lb (2-2.25 Nm).
NOTE:
When tightening screws make sure screw head is seated
against link with no space in between link and underside of
screw head.
Replace Fixed End Brackets
REPOSITION CABLES/HOSES. KEEP COVERED DURING GRINDING TO PREVENT
DAMAGE.
1.
Remove rivets as shown in link removal instructions.
Summary of Contents for T500J
Page 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Page 2: ......
Page 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Page 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Page 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Page 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Page 305: ......