SECTION 3 - CHASSIS & TURNTABLE
3-80
3121200
3.23
DRIVE MOTOR
Disassembly and inspection
1.
Place the Torqlink™ in a soft jawed vice, with coupling
shaft (12) pointed down and the vise jaws clamping
firmly on the sides of the housing (18) mounting flange
or port bosses. Remove manifold port o-rings if applica-
ble.
IFTHETORQLINK™ IS NOT FIRMLY HELD IN THE VISE, IT COULD BE DISLODGED
DURING THE SERVICE PROCEDURES, CAUSING INJURY.
2.
Scribe an alignment mark down and across the Torq-
link™ components from end cover (2) to housing (18) to
facilitate reassembly orientation where required. Loosen
two shuttle or relief valve plugs for disassembly later if
included in end cover. 3/16 or 3/8 inch Allen wrench or 1
inch hex socket required.
3.
Remove the five, six, or seven special ring head bolts (1)
using an appropriate 1/2 or 9/16 inch size socket.
Inspect bolts for damaged threads, or sealing rings,
under the bolt head. Replace damaged bolts.
4.
Remove end cover assembly (2) and seal ring (4). Discard
seal ring.
NOTE:
Refer to the appropriate “alternate cover construction” on
the exploded view to determine the end cover construction
being serviced.
Summary of Contents for T500J
Page 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Page 2: ......
Page 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Page 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Page 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Page 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Page 305: ......