SECTION 4 - BOOM & PLATFORM
3121200
4-9
7.
Apply JLG threadlocker 0100011 to the bolts and secure
the telescope cylinder to the boom base section. Torque
the bolts to 85 ft. lbs. (115 Nm).
8.
Install the Platform level cylinder. Refer Section 4.7, Plat-
form Level Cylinder.
9.
With adequate support, position the jib assembly with
platform level cylinder and boom.
10.
Install jib assembly with platform level cylinder and
boom, secure with hardware.
11.
With adequate support, position the pivot with the jib
assembly.
NOTE:
The pivot weighs approximately 24 lbs. (11 kg).
MAE30400
MAE31680
MAE30690
Summary of Contents for T500J
Page 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Page 2: ......
Page 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Page 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Page 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Page 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Page 305: ......