
SECTION 3 - CHASSIS & TURNTABLE
3121619
3-105
1864
996
524178
7
The urea pump is not able to control the urea
pressure between 9bar and 11 bar.
The urea pump controller is not able to control
the urea pressure between 9bar and 11
bar due to malfunction in the SCR system.
Suspected components:
- DEF pump broken
- Reverting valve continously open
- Urea suction line, backflow line broken or con-
nection swapped
- PWM Powerstage has a defect
- Pump Pressure sensor broken
Make sure that DEF lines, pump and tank are not
frozen.
Check for DEF level in the tank
Check DEF lines:
All lines connected? The right lines connected to
the correct places?
Suction line blocked?
Is there any leakage? Not also urea to the out-
side but also air into the lines, especially
in the suction line!
Perform SERDIA usecase "pressure test":
Does the DEF pump work properly? => check
wiring harness & PWM signal for pump
Does the DEF pressure rise?
Is the error healed?
If still unsuccessful so far:
- Check DEF pressure sensor: At ignition on and
SCR system state = 0 ("Init check"),
SCR_pAbsAdapUPmpP shall be identical to
EnvP_p. Fulfilled: Sensor okay!
- Check reverting valve
- Check DEF pump filter: dirt inside?
Suspected components:
DEF pump broken
Reverting valve continously open
DEF suction line, backflow line broken or con-
nection swapped
PWM Powerstage has a defect
DEF pump pressure sensor broken
1865
668
4360
2
Error at static plausibility check:
absolut temperature difference of sensed
temperature upstream SCR catalyst and
ambient temperature > as static plausibility
limit
at engine cold start (engine was off for at
least 8 h), temperature upstream of SCR cat-
alyst is expected to be identical to ambient
temperature => see enable conditions for
details.
Error at dynamic plausibility check:
temperature difference of sensed tempera-
ture upstream SCR catalyst and ambient
temperature < as dynamic plausibility limit
dynamic check is blocked if static plausibility
check is already faulty
=> Temperature upstream SCR catalyst
must be by 40°C higher than ambient tem-
perature if engine runs and a certain delay
time has expired.
Error at static plausibility check:
absolut temperature difference of sensed tem-
perature upstream SCR catalyst and
ambient temperature > as static plausibility
limit
at engine cold start (engine was off for at least 8
h), temperature upstream of SCR
catalyst is expected to be identical to ambient
temperature => see enable conditions for
details.
Error at dynamic plausibility check:
temperature difference of sensed temperature
upstream SCR catalyst and ambient
temperature < as dynamic plausibility limit
dynamic check is blocked if static plausibility
check is already faulty
=> Temperature upstream SCR catalyst must
be by 40°C higher than ambient
temperature if engine runs and a certain delay
time has expired.
Check whether temperature sensor upstream of
SCR catalyst is physically mounted
within exhaust pipe
If cold start condition can be made sure (engine
was off for at least 8 h) compare
values of EnvT_t, EngDa_tEng, Exh_TOxiCatUs,
Exh_tOxiCatDs and
SCR_tSensUCatUsT at ignition on, without
starting the engine. All identical?
Compare values of Exh_TOxiCatUs,
Exh_tOxiCatDs and SCR_tSensUCatUsT after 15
min in constant operation point: show all simi-
lar values (30 K tolerance width). Are
ambient temperature and (EnvT_t), cooling
water temperature (EngDa_tEng) plausible?
Sensor coated with urea crystalls? Dismount
urea injector and inspect temperature
sensor upstream SCR catalyst visually
Check wiring of sensor
Replace sensor
Table 3-10. Engine Fault Codes
Deutz
Code
Blink
Code
SPN
FMI
Description
Possible Cause
Action
Summary of Contents for 1850SJ
Page 1: ...Service and Maintenance Manual Model 1850SJ 3121619 June 29 2018 Rev J AS NZS...
Page 2: ......
Page 21: ...3121619 xvii LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 24: ...xx 3121619 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 50: ...SECTION 2 GENERAL 2 12 3121619 NOTES...
Page 55: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 5 This page left blank intentionally...
Page 56: ...SECTION 3 CHASSIS TURNTABLE 3 6 3121619 Figure 3 4 Axle Hose Routing Sheet 1 of 2...
Page 57: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 7 Figure 3 5 Axle Hose Routing Sheet 2 of 2...
Page 58: ...SECTION 3 CHASSIS TURNTABLE 3 8 3121619 Figure 3 6 Steering Axle Hydraulic Circuit...
Page 61: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 11 Figure 3 9 Turntable Hydraulic System...
Page 92: ...SECTION 3 CHASSIS TURNTABLE 3 42 3121619 Figure 3 39 Swing Bearing Wear Tolerance...
Page 94: ...SECTION 3 CHASSIS TURNTABLE 3 44 3121619 Figure 3 41 Swing Bearing Removal Sheet 2 of 4...
Page 110: ...SECTION 3 CHASSIS TURNTABLE 3 60 3121619 Figure 3 54 Engine Electrical Circuit...
Page 169: ...SECTION 4 BOOM PLATFORM 3121619 4 7 Figure 4 1 Boom Hydraulic System...
Page 173: ...SECTION 4 BOOM PLATFORM 3121619 4 11 Figure 4 2 Boom Assembly Sheet 1 of 9...
Page 174: ...SECTION 4 BOOM PLATFORM 4 12 3121619 Figure 4 3 Boom Assembly Sheet 2 of 9...
Page 175: ...SECTION 4 BOOM PLATFORM 3121619 4 13 Figure 4 4 Boom Assembly Sheet 3 of 9...
Page 176: ...SECTION 4 BOOM PLATFORM 4 14 3121619 Figure 4 5 Boom Assembly Sheet 4 of 9...
Page 177: ...SECTION 4 BOOM PLATFORM 3121619 4 15 Figure 4 6 Boom Assembly Sheet 5 of 9...
Page 178: ...SECTION 4 BOOM PLATFORM 4 16 3121619 Figure 4 7 Boom Assembly Sheet 6 of 9...
Page 179: ...SECTION 4 BOOM PLATFORM 3121619 4 17 Figure 4 8 Boom Assembly Sheet 7 of 9...
Page 180: ...SECTION 4 BOOM PLATFORM 4 18 3121619 Figure 4 9 Boom Assembly Sheet 8 of 9...
Page 181: ...SECTION 4 BOOM PLATFORM 3121619 4 19 Figure 4 10 Boom Assembly Sheet 9 of 9...
Page 187: ...SECTION 4 BOOM PLATFORM 3121619 4 25 Figure 4 16 Boom Assembly Torque Values Sheet 1 of 4...
Page 188: ...SECTION 4 BOOM PLATFORM 4 26 3121619 Figure 4 17 Boom Assembly Torque Values Sheet 2 of 4...
Page 189: ...SECTION 4 BOOM PLATFORM 3121619 4 27 Figure 4 18 Boom Assembly Torque Values Sheet 3 of 4...
Page 190: ...SECTION 4 BOOM PLATFORM 4 28 3121619 Figure 4 19 Boom Assembly Torque Values Sheet 4 of 4...
Page 201: ...SECTION 4 BOOM PLATFORM 3121619 4 39 Figure 4 20 Hose Adjustment...
Page 202: ...SECTION 4 BOOM PLATFORM 4 40 3121619 Figure 4 21 Section 3 Boom Cables...
Page 203: ...SECTION 4 BOOM PLATFORM 3121619 4 41 Figure 4 22 Section 4 Boom Cables...
Page 204: ...SECTION 4 BOOM PLATFORM 4 42 3121619 Figure 4 23 Section 5 Boom Cables...
Page 205: ...SECTION 4 BOOM PLATFORM 3121619 4 43 Figure 4 24 Jib Hydraulics Sheet 1 of 7...
Page 234: ...SECTION 4 BOOM PLATFORM 4 72 3121619 Figure 4 44 Powertrack Shimming Instructions...
Page 239: ...SECTION 4 BOOM PLATFORM 3121619 4 77 Figure 4 49 Powertrack Hose Installation Sheet 1 of 4...
Page 240: ...SECTION 4 BOOM PLATFORM 4 78 3121619 Figure 4 50 Powertrack Hose Installation Sheet 2 of 4...
Page 241: ...SECTION 4 BOOM PLATFORM 3121619 4 79 Figure 4 51 Powertrack Hose Installation Sheet 3 of 4...
Page 242: ...SECTION 4 BOOM PLATFORM 4 80 3121619 Figure 4 52 Powertrack Hose Installation Sheet 4 of 4...
Page 252: ...SECTION 4 BOOM PLATFORM 4 90 3121619 NOTES...
Page 432: ...SECTION 5 BASIC HYDRAULIC INFORMATION HYDRAULIC SCHEMATICS 5 180 3121619 NOTES...
Page 527: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 95 Figure 6 36 LSS Installation Sheet 1 of 4...
Page 528: ...SECTION 6 JLG CONTROL SYSTEM 6 96 3121619 Figure 6 37 LSS Installation Sheet 2 of 4...
Page 529: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 97 Figure 6 38 LSS Installation Sheet 3 of 4...
Page 530: ...SECTION 6 JLG CONTROL SYSTEM 6 98 3121619 Figure 6 39 LSS Installation Sheet 4 of 4...
Page 710: ...SECTION 7 BASIC ELECTRICAL INFORMATION ELECTRICAL SCHEMATICS 7 118 3121619 NOTES...
Page 711: ......