
Chapter 3 Ethernet Testing
Using J-Proof to verify layer 2 transparency
76
HST-3000 Ethernet Testing User’s Guide
Encapsulation
–
To transmit frames
that are not tagged,
select None.
–
To transmit VLAN
tagged frames, select
VLAN, and then spec-
ify the VLAN Tag and
User Priority.
–
To transmit Q-in-Q
tagged frames, select
Q-in-Q, and then
specify the CVLAN
Tag and User Priority,
and the SVLAN set-
tings for the tagged
frames.
Length
Specify the frame size.
Count
Specify the number of
frames you want to trasns-
mit.
Rate (fr/sec)
Enter the rate at which
you want to transmit the
frames.
Timeout (msec)
Enter the number of milli-
seconds the instrument
will wait to receive the
looped back frame before
stopping transmission of
frames.
Setting
Parameters
Summary of Contents for IP Video Test Option HST-3000
Page 1: ...HST 3000 Ethernet Testing User s Guide ...
Page 2: ......
Page 22: ...About This Guide Conventions xx HST 3000 Ethernet Testing User s Guide ...
Page 138: ...Chapter 3 Ethernet Testing MAC in MAC testing 116 HST 3000 Ethernet Testing User s Guide ...
Page 202: ...Chapter 5 TCP UDP Testing Loopback testing 180 HST 3000 Ethernet Testing User s Guide ...
Page 278: ...Chapter 9 Troubleshooting Resolving problems 256 HST 3000 Ethernet Testing User s Guide ...
Page 346: ...Glossary 324 HST 3000 Ethernet Testing User s Guide ...
Page 354: ...Index 332 HST 3000 Ethernet Testing User s Guide ...
Page 355: ......