
Chapter 1 Getting Started
Test applications
14
HST-3000 Ethernet Testing User’s Guide
100M Optical
Ethernet monitor
application
When monitoring 100M optical signals, the HST analyzes the
received signal on the R/T 2 SFP port.
illustrates the signal path when monitoring 100M
optical signals.
Thru
applications
Before running Thru applications, in addition to selecting the
Monitor/Thru application for the signal you are testing, you
must specify Thru as the test type (as opposed to the Monitor
type). When configuring a Thru application, you can specify
filter settings for each port, and test results can also be viewed
for each port simultaneously.
When running Thru applications for 10/100/1G electrical and
1G optical signals, the HST monitors the signal on the
receiving port, and then passes it through to the opposite
port’s transmitter.
Figure 7
Monitor application: 100M optical signal path
Summary of Contents for IP Video Test Option HST-3000
Page 1: ...HST 3000 Ethernet Testing User s Guide ...
Page 2: ......
Page 22: ...About This Guide Conventions xx HST 3000 Ethernet Testing User s Guide ...
Page 138: ...Chapter 3 Ethernet Testing MAC in MAC testing 116 HST 3000 Ethernet Testing User s Guide ...
Page 202: ...Chapter 5 TCP UDP Testing Loopback testing 180 HST 3000 Ethernet Testing User s Guide ...
Page 278: ...Chapter 9 Troubleshooting Resolving problems 256 HST 3000 Ethernet Testing User s Guide ...
Page 346: ...Glossary 324 HST 3000 Ethernet Testing User s Guide ...
Page 354: ...Index 332 HST 3000 Ethernet Testing User s Guide ...
Page 355: ......