Chapter 1 Getting Started
Test applications
12
HST-3000 Ethernet Testing User’s Guide
100M Optical
Ethernet terminate
application
When running a terminate application for a 100M optical
signal, events on the receiving SFP port (R/T 2) are analyzed,
but they have no affect on the signal transmitted by the HST
(the transmitted signal is generated independent of the
received signal). Analysis is restricted to the R/T 2 port.
illustrates the signal path when running a terminate
application for a 100M optical signal.
Monitor
applications
Before running a monitor application, in addition to selecting
the Monitor/Thru application for the signal you are testing, you
must specify Monitor as the test type (as opposed to the Thru
type). The HST then analyzes the received signal.
10/100/1G
Electrical Ethernet
monitor
application
When monitoring electrical signals, the HST analyzes the
received signal on the R/T 1 RJ-45 port.
The HST does not pass the signal through to the transmitter,
as it does in when running an electrical Thru application (see
“10/100/1G Electrical Ethernet thru application” on page 15
).
Figure 4
Terminate application: 100M optical signal
path
Summary of Contents for IP Video Test Option HST-3000
Page 1: ...HST 3000 Ethernet Testing User s Guide ...
Page 2: ......
Page 22: ...About This Guide Conventions xx HST 3000 Ethernet Testing User s Guide ...
Page 138: ...Chapter 3 Ethernet Testing MAC in MAC testing 116 HST 3000 Ethernet Testing User s Guide ...
Page 202: ...Chapter 5 TCP UDP Testing Loopback testing 180 HST 3000 Ethernet Testing User s Guide ...
Page 278: ...Chapter 9 Troubleshooting Resolving problems 256 HST 3000 Ethernet Testing User s Guide ...
Page 346: ...Glossary 324 HST 3000 Ethernet Testing User s Guide ...
Page 354: ...Index 332 HST 3000 Ethernet Testing User s Guide ...
Page 355: ......