P/N 960-100928R_Rev. 3 {EDP #192692}
© 2018, JAPAN CASH MACHINE CO., LTD.
2 - 1 1
Installation
UBA-RC™ Series Banknote Recycler
Section 2
Operational
Flowcharts
Figure 2-14 depicts a typical UBA-RC
™
Primary Sequence flow process.
a) Initializing
b) Stand-by
c) Is Acceptance inhibited?
e) External LED lights
f) Is a Banknote inserted?
B1) To Figure 2-15 “Validation” Flow on page 2-12 of
this Service Manual
g) Is Banknote dispensing required?
A) Return from “h” or “d” in this Flow
Apply Power to the Unit.
d) External LED extinguished
B2) To Figure 2-19 “Dispensing” Flow on page 2-16
of this Service Manual
h) Is Banknote collection required?
B3) To Figure 2-21 “Retrieving” Flow on page 2-17
of this Service Manual
A) Return to “A” in this Flow
a
b
e
c
f
g
h
d
A
A
B1
B2
B3
YES
YES
YES
YES
NO
NO
NO
NO
Figure 2-14
UBA-RC Operational Flowchart (Primary Sequence)