Page 11
7. Select the power supply entrance you want to use (Figures A) and
remove the short cabinet panel from the front of the spa to allow you
to feed the cable through to the control box. Install the cable with
connector through the large opening provided in the bottom of the
control box.
8. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figure C-D, page 12). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
9. Install control box door and reinstall the cabinet side panels.
Figure-B (Control Box)
10
4
3
2
2
2
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
TB1
TB3
Figure-A (Equipment Area)
1. Control Box
2. Power Supply Entrance(s)
3. Jets Pump #1
4. Heater
5. Spa Drain Valve
6. Pump Drain Plug(s)
7. Jets Pump #2
8.
Filter/Circulation Pump
9. Optional CD Ozonator (Purchased Separately)
10.
Factory Installed Ozone Injectorv
1
Flow
Note: Pump Locations Vary by Model
5
6
6
9
8
7
6
3
1
11. Control Panel
11
Figure-B (Control Box)
10
4
3
2
2
2
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
TB1
TB3
Figure-A (Equipment Area)
1. Control Box
2. Power Supply Entrance(s)
3. Jets Pump #1
4. Heater
5. Spa Drain Valve
6. Pump Drain Plug(s)
7. Jets Pump #2
8.
Filter/Circulation Pump
9. Optional CD Ozonator (Purchased Separately)
10.
Factory Installed Ozone Injectorv
1
Flow
Note: Pump Locations Vary by Model
5
6
6
9
8
7
6
3
1
11. Control Panel
11